In October, Mark and I – in the company of Maya – continued our Mercedes T2 (pre-Vario) camper build at Premiumcamper in Much, Germany. The truck is parked in front of Mirko’s workshop, where we can use his tools and expertise. Our live-in camper, Duke, is parked on the street, two minutes away by foot.
(As always, hover over or click on photos in galleries to read their captions.)
When I leave Maya at home, she gets in trouble (breaking into the trash can, spreading the contents, and eating everything “edible” or chewing through our pants pockets to reach treats) and when I take her to the Vario/T2, she is uncomfortable (and now cold) outside or in the way inside. It’s been tricky. But not nearly as tricky as all the projects we accomplished – or tried to accomplish.
We sold our old alternator and the fridge and table that came with the Vario to make up a little bit for our expenses, and donated an extra 100W solar panel to Mirko, our builder.
It took many after-work hours to discuss, draw, and detail our dinette and bed area. But that job was done by mid-October. Producing the pieces of wood with the CNC machine followed.
Mark and I installed a fan in the ceiling of the bathroom (but we had Darius cut that first giant hole in the roof) and an air conditioning unit in the living area. Those were big projects. We also added another junction box, lights, USB-charging ports, and other electronics in our living quarters.
The two water tanks needed cleaning, fittings, and connecting. And after one failed attempt, laminate siding appeared on the widened partition that separates our dinette area from the kitchen.
During the first half of October, we also put a magnetic doorstop in the bathroom, cut a protective rubber mat to size (this would be glued to our existing chassis rails as a buffer for the extra frame rails), figured out the positions for our backup camera and grab bar, dry-fitted our bathroom sink, ran more wires, and started working on the bathroom plumbing.
Countless hours were spent thinking, discussing, researching, and purchasing gear, materials, and tools. When we weren’t actually using our hands on camper projects during the day, it was time to keep our brains busy at night. And then, there were the delays – when we needed more/different parts, when it rained, when the professionals were too busy to help us. As the temperatures dropped, nights turned freezing, and more rain fell, we worried about our time frame to escape winter.
The second half of October had to be – and was – more productive. Some serious projects finally got completed: Mark and I installed six solar panels on the Vario’s roof (a total of 900 watts), secured and connected the 3,000 watt inverter, installed and tested the water tanks (270 liters in total), dealt with multiple leaks, finished the bathroom plumbing, and mounted a backup camera.
We also replaced the clutch fluid (and still have to deal with the brakes), stained the wooden side boards and planks for the bed contraption, installed two lithium batteries, and finished all the wiring. Many of our projects happened with the trial-and-error method, since we – really – don’t know what we’re doing and have never built out a camper before.
Mirko installed rear blocks on the suspension and Mark replaced the front shocks. The rear ones were out of stock, so that project is for later.
Furthermore, our furniture was finished and installed. This was a huge step as the habitat finally looked like a livable space.
There were many frustrating moments as well. After endless checks and recalculations, the metal rails to support our subframe arrived. Mirko and Mark managed to install most of the system, but one of the pieces was wrong, so the project wasn’t finished yet.
The waste water tank we ordered, showed up in the wrong color: grey instead of black. The company had a hard time understanding why the color mattered… Because everything else under our habitat box is black! They eventually agreed to refund our money. We sent the wrong tank back and ordered the right one from a different company.
Our long-awaited fridge arrived from Italy after eight weeks instead of six. It had been quite the ordeal to even order (and inconveniently wait for) the thing and, once it arrived, our initial excitement and relief were promptly replaced by helplessness and despair when we realized the company had sent us the wrong fridge and the mounting frame had been cracked in transport. More problem solving was needed, as the seller is not helpful at all. Plus, one of the batteries we ordered has an issue and needs to be replaced as well.

Testing our new fridge that finally arrived from Italy after eight weeks!
We worked almost every weekend in October – sometimes only on Saturday, usually on both days – and only managed one little trip to Eckenhagen. This was a tiny town with not much to see or do, but it offered dumping facilities for Duke and forest trails for Maya, which we took advantage of on Saturday afternoon. On Sunday, it rained all day.
Because of our busy work schedule, keeping our life going became tricky. Sometimes, we only had crackers with one or two raw vegetables for lunch; other times we had to be creative with our dinners. Returning unfit Amazon items for a refund became difficult with DHL’s office hours being shorter than ours. Maya was not getting enough exercise. Dumping our cassette toilet once a week was an inconvenience since the closest place to do so is twenty minutes away. Luckily, we could fill up our camper with drinking water at Mirko’s and disposing of the grey water wasn’t an issue either.
When the Vario work became too much and our needs for laundry, other errands, and a change of scenery increased, we drove to the little house in Belgium for two nights.
In this familiar area, we managed to wash our clothes, visit with my parents, fix and reinstall a few items in Duke, give each other haircuts, take Maya on nice walks, and eat some favorite Belgian foods. It was a long – and expensive – drive, but we felt refreshed and accomplished afterwards.
And “just like that” another extremely busy month has passed. Fall has arrived with colorful trees and icy temperatures. We hope to wrap up this Vario project, sell Duke, and roam about again by the end of November.
Expenses for October 2026
October was a decent month for Mark and me, as far as living expenses are concerned. Mostly because we didn’t do anything fun, tried our best to remain frugal, and focused on physical projects. Our Vario build bill is increasing by the thousands, though.
We tried to stay under $400 for groceries, and we succeeded! Our monthly diesel expenses went up, because the prices in Germany are not coming down at all (between €2.20 and €2.40 per liter at the moment, which is the equivalent of $10 a gallon) and because we decided to do a 600km roundtrip to Berlare, Belgium, for the weekend.
We bought a bunch of household supplies ($239), like a cool, telescopic ladder, more tubs and tools, and a CO alarm. Since these items are transferrable, we put them towards our living bills and not our Vario bills.
Most nights, we cooked nice and healthy meals at home, but this past month, we did grab take-out food about once a week and ate out one evening. It’s nice to not have to prepare meals and do the dishes after an exhausting day. Our total bill for that category was less than $100.

Take-out pizza for dinner!
We bought more wine and a six-pack of beer in Belgium ($78) and had to exchange our propane tank again ($36), because winter weather has arrived. One of our tanks only lasts about two weeks this time of the year. The propane is used for cooking, hot showers, and heating. Mark bought me my very first SIM card, so we can actually communicate and I have my own internet source when I stay in Duke with Maya, while he’s in the Vario. This restricted plan cost $5, on top of our monthly German plan of $15.
The bill for Mark’s visit to a Belgian hospital in August finally arrived. He was there for a consult, which cost $52, since we don’t have health insurance outside of Massachusetts. We paid $12 to ship a used alternator to the buyer and $11 for a blind repair kit. This 5-hour Duke project was tackled in Belgium and saved us about $1,000 for a replacement contraption.

Fixing the screen and blind contraption of Duke took a lot of time and patience. And space.
And the smallest numbers of October went to a month-long Amazon Prime membership for Amazon.de ($11), which we are using daily, and to hosting fees for one of our website domains ($10).

One of our three free camping areas near Much
We managed to camp for free every night and use my parents’ laundry facilities.

One day, I’ll be able to do my own laundry in my own machine!
Our grand total for last month was under $1,300, which has been our average for decades, before 2026 arrived!
Here is the breakdown:
- Groceries: $395
- Car (fuel): $307
- Household supplies (telescopic ladder, CO alarm, tools, storage tubs): $239
- Dining out (pizza, kebab, fries, Chinese food): $97
- Alcohol: $78
- Utilities (propane: $36; internet: $20; electricity: $1): $57
- Medical (hospital bill Mark): $52
- Postage (shipping alternator): $12
- Camper repair (blind repair kit): $11
- Miscellaneous (Amazon Prime): $11
- Computer (hosting domain name): $10
- Camping: $0
- Laundry: $0
TOTAL: $1,269
Next up: Probably our November 2026 update and expenses, unless something else is worth reporting on earlier.
Donate to Roaming About to help maintain this website:
Curious about a previous ten-year chapter in our nomadic lives, which includes eight years aboard a 35-foot sailboat in the tropics with dogs? Check out my compelling, inspiring, and refreshingly honest travel memoir:
Discover more from Roaming About
Subscribe to get the latest posts sent to your email.



November 5, 2026 at 2:03 pm
you guys are amazing and hopefully you are finding time to sleep! onward to november-
November 6, 2026 at 7:09 am
Thanks, Beth! We have needed to go to bed right after dinner and dishes, between 8pm and 9pm, because we have been so exhausted and commit to 7am (or earlier) starts. Luckily, because it’s so much colder now, the nights have been pleasantly quiet. 🙂
November 5, 2026 at 2:38 pm
I don’t know how you do it. It’s getting closer all the time. It must be frustrating to wait so long for a supplier to send an item, only to find it’s not what you ordered.
November 6, 2026 at 7:11 am
Hi Pete,
We have both come very very close to giving up! Working hard and achieving your goals is one thing, but having to deal with setbacks multiple times a day is super draining and depressive. One day, we hope to say it was all worth it! In the meantime, we wear our winter jackets, get into a tough routine, and turn the heat in Duke up. 🙂
November 5, 2026 at 2:51 pm
What an amazing project. And I’m glad you get free laundry 😁.
Stay safe and, as always, wishing you good health .
Steve
November 6, 2026 at 7:13 am
Thanks for the wishes, Steve! We did have to drive 600km to get that free laundry, though. 🙂 That being said, a friend of a friend twenty minutes away has offered her washing machine, dryer, and shower for us to use as well. We just haven’t had the time to take her up on this during the weekend – or on a weekday.
November 5, 2026 at 5:27 pm
You guys are the most industrious couple I know. I’m glad you’re making progress on the livability of the Vario. Even with a few nights in the little house in Belgium, your schedule seems punishing–but you’ve made it this far into November. Brava!
By the way, I read your post in reverse–backward to the beginning. Interesting!
November 6, 2026 at 7:14 am
Thanks for the continued support, Marian. It does make me smile. And, why did you read the post backwards? Is WordPress playing tricks with you or me? Or are you trying out something different?
November 6, 2026 at 9:37 am
Yes, I’m trying something different. I guess I was feeling experimental yesterday–ha!
November 8, 2026 at 1:34 pm
🙂
November 5, 2026 at 6:08 pm
Dog parking–that’s pretty cute.
November 6, 2026 at 7:15 am
Hi Jacqui,
We’ve seen a few of those dog parking areas at supermarkets in Germany. If only they are covered, have a blanket or dog bed, and come with a full bowl of water, haha. I think I’m asking too much now.
November 5, 2026 at 11:02 pm
Looks like things are coming along and I hope you reach your goals before winter and also I like seeing the photos along with the text. I hope you have a great weekend and cheers to November.
November 6, 2026 at 7:17 am
Thanks for the wishes, Yvette! We are seeing the end of this tunnel! We will work another weekend, but hope to be finished at some point next week. Until next spring (we already have a list with postponed projects for that)…
November 6, 2026 at 12:13 am
Oh my, this brings back some of the nightmares of our build…
It sounds like it’s going in the right direction, though. Congratulations on the immense progress you have made 🙂
November 6, 2026 at 7:19 am
Hi Jackie,
I’m sure a lot of this sounds and looks familiar! You two have way more grit, determination, and humor than us, though. And, probably more skills as well… But “nightmares” is a pretty good description for some of this. We can almost hit the road again!
November 6, 2026 at 11:56 am
Sounds totally overwhelming and difficult but very satisfying!
November 8, 2026 at 2:23 pm
That’s a good summary of our last three months, Lexie! 🙂
November 6, 2026 at 1:15 pm
When you posted on FB that you got the wrong tank and needed a black one, I was confused. Why would you need a black water waste tank? Now I see it is for aesthetics.
I hate that it is getting cold! It is getting cold here too, but we will be off this mountain soon and back in the desert. Plus we have a garage that the van fits into to work on our projects. Wish we had had this when we were doing the build.
I hope you are getting everything you want in this van. That is the great thing about designing and building it yourself—it is customized to your needs.
And how great to have that machine to make all your wood cuts! I know Greg is jealous of that. Our build probably would have gone much faster.
November 8, 2026 at 2:31 pm
Hi Duwan,
My mind has been a bit scattered lately as we’ve been so crazy busy and overwhelmed with everything to do with the Vario build and prep. I should have specified that out grey tank is mounted outside the vehicle. 🙂
You have such a great house sit going on right now! I’m glad you get to use the garage (and it’s tall enough) to work on the van a bit more. When our Vario ends up inside Mirko’s workshop for a project, always over the weekend, we try to take advantage of working full days on it while it’s inside. It’s now freezing here are night. Crazy. Too cold to work or be outside really. I’m so glad the diesel heater was one of the first things Mark installed.
Darius has been building our recent furniture by hand and it’s taking sooo much longer (meaning it’s more expensive as well) so I understand how Greg feels about all that.
The thing is that this camper is a compromise. We don’t get it the way we would have wanted. Instead, it’s been challenging to work around the existing systems, wiring, and furniture. That being said, whatever area was still “virgin” (like the roof), we tried to customize it to our needs. Time will tell if it’s comfortable and convenient enough for us to live and travel in. Otherwise, we will put the overland vehicle up for sale. We’ve added a lot of value to it. 🙂
November 6, 2026 at 4:21 pm
So much work! Be cool to see it when it’s finished.
November 8, 2026 at 2:31 pm
We are almost there, Alex. This time around. 🙂
November 7, 2026 at 7:48 am
Great to hear about the installation of Air-Con and your very own washing machine. But what a busy month for you guys while Winter creeps towards us. I hope you’ll escape its clutches.
As for Maya, okay, I know she raided your pockets and the kitchen bin, but I can’t help but fall for that face. She looks so innocent.
November 8, 2026 at 2:35 pm
Hi Hugh,
Unfortunately, winter has arrived in western Germany! We’ve had some biting cold days with icy winds, freezing temperatures at night, and frost in the morning. Together with the reduced amount of daylight, life is getting pretty grim to work and live in and on campers.
Maya, innocent??? Never. Sometimes she’s still licking her lips when I return. Or she gives me the lowered head “I’m guilty of something” look. I’ve learned to empty the trash every morning, before we show up for Vario work. Soon, that won’t be a problem anymore, though. 🙂
November 7, 2026 at 7:45 pm
A month of challenging work for you and Mark but you’ve made progress. I hope you’ll be able to get some rest through winter and feel recharged to tackle finishing Vario after the rest.
November 8, 2026 at 2:36 pm
Hi Natalie,
You’re so right. It’s been a long time of stress and exhaustion, focus and slow progress. But we are seeing the end of the tunnel now and just finished a list of things to address next spring. Hopefully, the Vario is built, equipped, and prepped enough to go south for the winter.
November 8, 2026 at 2:52 pm
Wow! Having the CNC machine available must have been amazing. But just reading all that you have done makes me tired. 🥱 900 watts on the roof! Excellent!! We wish we had installed a 3000 watt inverter 9 years ago instead of the 2000 watt. OK, I cannot even imagine you had room for a washing machine. Where?!?!?!? Under the bed???? So glad to hear you had a place in Belgium you could recoup for 2 nights. And of course, I have no idea how you three mange on as little expenses as you do. Thank you for sharing. Jim
November 15, 2026 at 7:44 am
Hi Jim,
When you work non-stop on projects, there is not much time left to spend money, haha. I’m sure once we reinstate our “normal” life of living and traveling in a home on wheels – which we haven’t done for almost an year now!! – our expenses will rise. Just for fuel alone if nothing else, since diesel is so expensive in Europe.
The mini-washing machine (it takes 2.5kg of clothes) is taking up a chunk of our not-so-big garage space under the stacked beds. Now that the grey water tank is installed, I look forward to using it in earnest. Of course, we will need sunshine to dry the clean clothes! 🙂
November 10, 2026 at 11:59 am
Wow, that’s a lot of work, and an amazingly low budget. Constant work doesn’t sound very enjoyable, but at least you know it’s short-term. Plus you have the excitement of seeing your “dream camper” slowly coming together! You must be SO ready for it to be done.
(The “dog parking” gave me a chuckle.)
November 15, 2026 at 7:49 am
Hi Diane,
Yes!!! We are so ready to wrap up four months of full-time work on the Vario and hitting the road. As to it being our “dream camper”, that remains to be seen as we’ve had to make a lot of compromises because we decided to buy a half-built one instead of starting fresh with our own design and requirements.
November 10, 2026 at 1:00 pm
I continue to be amazed that you are both so technologically savvy, and have figured out down to the minutest detail how the Vario must be outfitted, Liesbet! You two are a perfect match for each other, truly one made in heaven.
November 15, 2026 at 7:55 am
Hi Annie,
Thanks for the compliment. It made me smile. Especially since Mark is the only technologically savvy one and he got seriously out of his league with this project. That being said, we put all the research, effort, time, and resources in it that we could manage.
About that match made in heaven… We do have the same interests and priorities in life, but our relationship is far from perfect. Many of the factors that were a struggle in my memoir, Plunge, still exist…